How’s the soil? Able to dig by hand?
To a point. Since it was a cropland when I got it there is a hardpan about a foot and a half down. I typically dig holes starting with a gas powered auger and once I hit hardpand I fill the hole with water and come back the next day. It takes 4-5 days to get a 3 ft hole. Good thing I'm not in a hurry.